Kitchen area and associated piping.
Laundry room trap & supply
Large earthquake hold-down bolts buried 18 inches into the ground!  Plus the Kitchen plumbing.
Back patio taking shape.
Bathroom venting and drainage piping install
Unloading 3rd and final semi trailer of materials, including doors, windows, insulation and drywall.
Flooring & Counter Selection
Kitchen Counters!
Doors, Windows and other large things!
John and Tim install Master Bath window
Someone is a little too happy about a bathroom window....
First window installed into house!
Master Jacuzzi tub form.
HVAC furnace and air plenum.
John striking a pose in the Dining Room.
Master bath sinks area.
AC ducting
Brooke's tub installed
Front Door being installed
Tim and John install the front door.
Roofing!  Ugh....hot and heavy stuff...
ABC Supply in Monrovia with their fancy conveyor belt.
Lots of material!
Loading materials onto the roof!
There will be an entire truck load soon!
Roofing
being
loaded
A real back saving invention!
John rolling out felt paper.
Tim aligns 1st piece of roofing felt.
Brooke is happy there is finally roof covering!
Tacking 30lb felt down.
Almost done....thank GOD!
Seems like forever with a 60 x 60 roof!
Finished drip edge around patio.
John and Tim endure 110+ temperatures!
Roof work is hard!!!
99% completed front roof (still need to cut the valleys & some overhang).
Roxanne had to take this picture of John & I.
Completed rear roof
Complete rear roof!
Cabling, Fireplace and Misc other construction finish items.
Our expensive, hard to find fireplace (Heat N Glo model Cresent II)
Our hot mopped shower!  Fulgham's Hot Mapping rocks!
Can you say Jacuzzi?
Wiring rat's nest in the master closet.
Wires feeding into circuit breaker panel.
A garage full of stuff!
The game / media room awaits the crowds of kids.
Rob's hot mopped shower pan.
Yeah, my IDF closet doesn't look pretty yet, but it will!  Who else will have 2 Cisco switches, wireless access point, CAT 6 & 5e, with about 50 drops?
House Tour #1
House Tour #2
Framing Inspection expected week of September 28th (please, please, please!).  
Then we move into Phase 5 - insulation, drywall, painting and flooring!  Yee-ha!
Phase 4 - Mechanical Installation
Yes - it's been awhile since we've updated the site (sorry about that).  As you can
imagine - it's been overly hectic!  Working 8 hours for work, then another 4 to 8 to
12 hours for the house can tend to eat up all the hours in the day, especially when it's
back to back with no weekends off!  Ok, enough of my whining!  Alot has been
accomplished since the structure was installed.  We've secured the house with huge
anchor bolts, giant roof truss bolts, begun roofing, completed the water piping (hard
& soft sepaeration, plus hot circulation), gas line, purchased the house flooring
(hardwood and tile), installed bathroom fans & vents, electrical rough-in, Internet (Cat
5 & 6), IDF closet, fireplace, venting of oven, gable vents, roof turbine vents, tub
placement and the all-import front door and windows installation.  
Sheez....someone
please bring me a 12-pack of Mike's Lemonaide!!!
Nice plumbing work @ the water softener!