Next, the architectural process in 2004!  After almost exactly one year, and coming
basically full circle (meaning we ended up using virtually the same plans that he
(and Roxanne) had proposed.  My second story house, with 4-car drive through
garage, was nixed after learning about the city's laborious approval process for
anyone adding a coded second floor.  Sigh....
With permits in hand (and credit
cards strained by those damn fees),
we began to cut over the electrical
panel from the main house to the
guest house (or office).  With a quick
inspection or two, we are ready to
begin demolition!  
We've packed the house up and brought only some clothes, movies, games (and of
course 4 computers) back into the office.  Roxanne decided we should have some
escape from the close confines of the four of us in a 450 sq ft (or so) enclosure, so she
purchase a patio set for another getaway!
Now - the fun stuff!  As Mr. John "Cougar" Mellencamp said -
"When the Walls Come Tumbling Down"!  First was the symbolic
Patio Wall!
Brooke gets the medium sized hammer, and contemplates the ramifications of beating a wall that has never hurt her.
Come Ched - Don't be a girlie Man!
Come on girl....Hit the WALL!
Amanda has good form!
Nice goggles!
Toby show his boy how to destroy!
Deanne takes her turn...
At some point, we had to graffiti the old house...we're such delinquents...
Last
Tour
of Old
House.
Now - On To the Actual Demolition!!!
While the plans called for us to re-use some of the walls, after inspection we found active termites
throughout the house!  Yikes!  Looks like we'll be incurring some additional lumber costs... I should
mention it took ONE day to wipe the house out....
Brooke's room gets pounded a few times.
Rob's room suffers the first bits of damage....well...beyond the termite damage.
Rob drives Caterpillar tractor
Tim Rips first
piece of house
off!
Fernando
rips off roof
Hallway looking into living room
Bathroom demolition
Rob's roof
comes off!
Living room
roof comes
down.
Roxanne ready to get busy
Brooke drives tractor
House back
wall
demolition
Our old bedroom
Kitchen
wall comes
down.
House half
gone!
90% gone
Ed & Rob watch the last wall come down
House
2/3rds gone!
It's ALL gone!
Rob and Brooke wish the old house good-bye!
House is All
Gone!
Last Piece -
The Chimney -
comes down.
On to Construction Phase 2 - Foundation and Framing!
Water Trench picture 2
Here the wall foundation is laid down.
Phase 1 - Demolition
First - we had to rip down portions of the fencing along the south wall.  
Unfortunately, this meant the demise of our beloved grape vine.  This took
place in the summer 2003.